News
Road Construction-Channelside Drive
Posted on Dec 19th, 2018

 

Tentative Old Water construction schedule:

CWS-19-0000052 permit (Old Water St Improvements and Force Main)

 

·         Phase 1: Old Water(Franklin to Marriott Entrance)

o   12/17/18 ‐ 1/16/19

·         Phase 2: Old Water (At Florida Intersection – Marriott has access to entrance and exit)

o   1/16/19 – 2/2/19

·         Phase 3: Old Water (Marriott Exit to Marriott Loading Dock)

o   2/2/19 – 2/19/19

·         Phase 4: Old Water (Marriott Loading Dock to Morgan)

o   2/19/19 – 3/15/19

·         Phase 5: Old Water (Morgan Intersection)

o   3/15/19 – 3/26/19