Tentative Old Water construction schedule:
CWS-19-0000052 permit (Old Water St Improvements and Force Main)
· Phase 1: Old Water(Franklin to Marriott Entrance)
o 12/17/18 ‐ 1/16/19
· Phase 2: Old Water (At Florida Intersection – Marriott has access to entrance and exit)
o 1/16/19 – 2/2/19
· Phase 3: Old Water (Marriott Exit to Marriott Loading Dock)
o 2/2/19 – 2/19/19
· Phase 4: Old Water (Marriott Loading Dock to Morgan)
o 2/19/19 – 3/15/19
· Phase 5: Old Water (Morgan Intersection)
o 3/15/19 – 3/26/19